Jupiter Square Mirror

Refined, pure lines and geometric shapes define the aesthetics of the Jupiter collection. Available in a range of luxurious metals and mirror finishes in various shapes and sizes.

DETAILS

Dimensions:  L80 x W80cm
Lead Times:  usually 8-10 Weeks

OPTIONS
Frame:  
Mirror Finish:  

Price:  £560.00

Embossed Mocha

Burnished Brass

 

 

Silver

Bronze

 

Our delivery prices vary depending on the delivery location, as outlined in the table below.
The delivery charges below are to the 1st floor only. Deliveries above the 1st floor are charged at £15 per floor for each floor walk up unless you have a working lift on the day of delivery.

Delivery Zone Delivery Prices Postcodes Within Each Delivery Zone

Zone 1

2 Man-£102
4 Man-£204

All of London & Greater London, plus:
CR, BR, DA, RM, IG, SM, WD, HA, UB, TW, KT, EN

Zone 2
2 Man-£120
4 Man-£240
LU, AL, SG, HP, CM, SS, SL, RG, GU, RH, TN, ME

Zone 3
2 Man-£150
LE, CV, NN, MK, PE, CB, IP, CO, OX, GL, SN, SP, BH, SO, PO, BN, CT

Zone 4
2 Man-£198
TA, DT, BA, BS, CF, NP, NPT, HR, LD, WR, B, DY, WV, WS, TF, SY, ST, CW, CH, DE, ST, CW, WA, L, WN, BL, M, SK, S, HD, HX, OL, BB, WF, LS, DN, NG, LN, HU, PR, FY, LA, BD, HG, YO, NR


Zone 5

2 Man-£500 LL, SA, EX, TR, PL, TQ

Assembly & Installation

Assembly Our normal delivery service includes standard assembly and set up of furniture in the room of your choice.

Non standard deliveries If you require more than our standard 2 man delivery (such as a 4 man delivery, or widow delivery) then the prices are available on a quote basis. Please contact us for more information

Current Lead Times: 8-10 Weeks

The lead time for this item is usually 8-10 weeks. This is the time it takes for your order to arrive into the UK.

If you need something sooner the please visit our stock page here: http://www.amode.co.uk/furniture-in-stock.html

August & Christmas Shutdown

During the entire month of August all furniture manufacturers in Italy, and most of Europe, are closed for their annual summer holidays. Orders placed in the run up to August, and within the month of August will have their delivery lead times affected. Orders placed in August will mean that the lead time quoted for your order will be effective from the 1st of September. Orders placed in the 4 to 8 weeks leading up to August will have their lead times effected on a pro-rata basis.

During the month of December manufacturers have between a 2-3 week break. Production is stopped during this period, so if you order is being produced between this period please bear in mind that this can affect your standard lead time.