Design Notes

Thanks to the large range of colour and finish options the Muse range can be either dressed up or dressed down depending the the colour scheme or style that you want to achieve.

Circus Tall Cupboard, Lacquer

Harking back to an era since gone, the Circus highboard evokes a time when elegant formalities and cocktail hour were the order of the day. The Circus Highboard is composed of two doors, asymmetrically positioned to create relationships between lines and surfaces which are decidedly original and highly effective. The visual and structural dynamism of the Circus sideboards does not however overlook a focus on details in the manufacture, with the 45° mitre joints between the side and front panels and recessed handles that allow you to play with different colour materials to create an entirely unique design.

The graceful offset recessed handle is finished in a brass finish, to draw a refined, dramatic line intersecting through the body of the unit.

The sophisticated metal framework of the legs is lacquered in a matt finished to match the colour of the unit, which interlocks and create a unique focal point, and are delicately emphasised by the edition of elegant brushed brass metal tips.

 

DETAILS

Dimensions:  L100 x D45 x H160cm approx
Lead Times:  usually 8-10 weeks (please see current lead time below)

OPTIONS
Finish:  
Lacquer Colour:  

Price:  £2,790.00
  LACQUER COLOUR SAMPLES
 

Artico

Bianco

Burro

Canapa

Juta

Visone

Creta

Terranova

Brown

Magnolia

Grigio Corda

Ardesia

Ferro

Anthracite

Black

Ghiaccio

Carta Zucchero

Bluette

Cobalto

Petrolio

Murano

Prato

Aftereight

Muschio

Senape

Zolfo

Zucca

Cuoio

Maranello

Amarena

Prugna

Titanio

 

 

The unit as standard will have a 2cm plinth, however you can choose to have metal cylinder feet which will raise the total height of the unit. The following table shows the available feet options and corresponding heights:

Our delivery prices vary depending on the delivery location, as outlined in the table below.
The delivery charges below are to the 1st floor only. Deliveries above the 1st floor are charged at £15 per floor for each floor walk up unless you have a working lift on the day of delivery.

Delivery Zone Delivery Prices Postcodes Within Each Delivery Zone

Zone 1

2 Man-£102
4 Man-£204

All of London & Greater London, plus:
CR, BR, DA, RM, IG, SM, WD, HA, UB, TW, KT, EN

Zone 2
2 Man-£120
4 Man-£240
LU, AL, SG, HP, CM, SS, SL, RG, GU, RH, TN, ME

Zone 3
2 Man-£150
LE, CV, NN, MK, PE, CB, IP, CO, OX, GL, SN, SP, BH, SO, PO, BN, CT

Zone 4
2 Man-£198
TA, DT, BA, BS, CF, NP, NPT, HR, LD, WR, B, DY, WV, WS, TF, SY, ST, CW, CH, DE, ST, CW, WA, L, WN, BL, M, SK, S, HD, HX, OL, BB, WF, LS, DN, NG, LN, HU, PR, FY, LA, BD, HG, YO, NR


Zone 5

2 Man-£500 LL, SA, EX, TR, PL, TQ

Assembly & Installation

Assembly Our normal delivery service includes standard assembly and set up of furniture in the room of your choice.

Non standard deliveries If you require more than our standard 2 man delivery (such as a 4 man delivery, or widow delivery) then the prices are available on a quote basis. Please contact us for more information

The lead time for this item is usually 8-10 weeks. This is the time it takes for your order to arrive into the UK.

If you need something sooner the please visit our clearance page here: https://www.amode.co.uk/offers.html

August & Christmas Shutdown

During August production in our factory is closed for 2 to 4 weeks for the annual summer holidays. Orders placed in the run up to August, and within the month of August will have their delivery lead times affected. Orders placed in August will mean that the lead time quoted for your order will be effective from the 1st of September. Orders placed in the 4 to 8 weeks leading up to August will have their lead times effected on a pro-rata basis.

During the month of December a 2 week holiday period is also to be added to the standard leadtime. Production is stopped during this period, so if you order is being produced between this period please bear in mind that this can affect your standard lead time.