Porto Console Table

Distinctive, graceful, timeless. Clean lines and geometric shapes are perfectly proportioned to deliver  collection that is well balanced and highly sophisticated, making this collection an essential addition to any contemporary living space.

DETAILS

Lead Times:  usually 8-10 weeks (please see current lead time below)

OPTIONS
  
  
  
  
  

Price:  £3,360.00
+

Carrara White Marble

Marquinia Black Marble

Emperador Brown Marble


Grey Stone Marble


Velvet Brown Marble

Perfetto Brown Marble

Verde Guatemala Marble


Black Gold Marble


Calacatta Gold Marble
 

Black Stained Oak Veneer

Whitened Oak Veneer

Wenge Stained Oak Veneer

Cherry Stained Oak Veneer

Cherry Milano Stained Oak Veneer

Dark Walnut Stained Oak Veneer

Tobacco Stained Oak Veneer

Natural Stained Oak Veneer

Grey Taupe Oak Veneer
 
  Category 1 Lacquered Metal Frames

White Matt Lacquer RAL 9016

Black Matt Lacquer RAL 9017

Classic Bronze Matt Lacquer

Golden Beach Matt Lacquer

Gold Pearl Matt Lacquer

Anodyc Bronze Matt Lacquer

  Category 2 Metal Frames

Aluminium Brushed Matt Metal

Chrome Shiny Metal

  Category 3 Metal Frames

Dark Grey Brushed Matt Metal

 

  Category 4 Metal Frames

Antique Brass Brushed Matt Metal

Copper Brushed Matt Metal

Antique Gold Brushed Matt Metal

Black Chrome Shiny Metal

Bronze Shiny Metal

Brass Shiny Metal

Any RAL Colour Matt Lacquer Metal
 

Assembly & Installation:

  • Our standard white glove delivery service includes assembly of your furniture in the room of your choice & removal of packaing materials.
  • We install heavier items with 4 up to 10 men.
  • If a crane is needed we can also arrange this.
  • We do not wall hang items such as mirrors or complex installations.
  • We deliver from Monday to Friday with a 3 hour timeslot.

Please contact us for a delivery quote.

Access:

  • We will need to know about access through your property when you place an order.
  • As the furniture is bespoke we can manufacture based on your access.
  • If access is tight we can make the furniture in smaller parts to enable a successful delivery.

 

The lead time for this item is usually 8-10 weeks. This is the time it takes for your order to arrive into the UK.

If you need something sooner the please visit our clearance page here: https://www.amode.co.uk/offers.html

August & Christmas Shutdown

During August production in our factory is closed for 2 to 4 weeks for the annual summer holidays. Orders placed in the run up to August, and within the month of August will have their delivery lead times affected. Orders placed in August will mean that the lead time quoted for your order will be effective from the 1st of September. Orders placed in the 4 to 8 weeks leading up to August will have their lead times effected on a pro-rata basis.

During the month of December a 2 week holiday period is also to be added to the standard leadtime. Production is stopped during this period, so if you order is being produced between this period please bear in mind that this can affect your standard lead time.

 


Complete the Look
50%
OFF
Ex-Display: Porto Console Table

Ex-Display: Porto Console Table£4,040.00   £2,020.00